Jump to content

Recommended Posts

Posted
that would be sick!!

but we all know bear will pull the we don't have enough vertical so that won't work

 

we can all hope bear will put some extra dirt up there so the can have more vertical

 

 

they are plenty of highspeed lifts in the world that have less vert than bear fyi.

  • Replies 526
  • Created
  • Last Reply

Top Posters In This Topic

Posted

Bear will not open up a highspeed lift! If bear had a highspeed lift the runs would be too crowded. Bear keeps there quad slow and has it on the most popular run because they want to keep the people on the mountain at one given time low. Imagine if they have a highspeed quad. Hitting a jump withoutgetting cut off is like driving on the skuchyll.

Posted

i heard they got 20 new guns and they only have 3 or 4 in the jump line so i think they are probly somewhere else on the mt

 

 

 

the jump line will probly be perminate because tubers are gay

Posted

Tubers are gay nothing but the truth, but I don't for see them making the changes they did for a jump line that won't be permanent they moved a good amount of soil and did more with the ground for it so I'd guess permanent.

 

Also I'd love to see at least a quad there I mean think about it, you'd cut the wait time in half for the park and you wouldn't have to worry about kids falling and shit like that.

Posted

It'll be jumps. The rest of the terrain parks are pretty much jib-gardens with the exception of the jump line on the left side of Black Bear.

Posted

i just called bc and the people at the front desk said they wern't blowing snow

 

 

 

they still seem to be doing alot of work for not atleast testing the system

 

i guess we will have to wait and see

Posted

Here are a few updates to answer some of the questions:

1) Lighting has been improved on the tubing park jump line. It is permanent and we did add 6 new guns in that area.

2) The new lift will be a fixed grip quad. The issue is not vertical, it is the line length of the lift. The shorter the length, the more often chairs come off and reattach to the cable leading to chair spacing issues and increased down time. Last year was the first year Doppelmayr/CTEC installed a high speed with a line length as short as ours. Until that, they did not recommend installations with a line length less than 3000'. For reference, the line length on A lift is roughly 2400'.

3) The new guns went in the tubing area, bottom of Kodiak, Cub Run, Broadway and a few fill in spots on upper Kodiak, Drifter and Timberline.

 

I hope that helps. Check out the webcams, the snow looks great!

Posted

I doubt we'll hear an opening date until this coming or next weekend with all this crap snow making weather, but it would be really nice to hear something at the rail jam this weekend if it happens.

Posted

bear does not need a lift like that yes it would put to many ppl. at the top and the lift now is not THAT bad so i think they dont really need it

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...